Current US 601 Traffic Conditions
US 601 Traffic Delays
-
North Carolina US 601
135mi From Mount Airy to Monroe
2 hours 36 mins travel time instead of 2 hours 5 mins
31 minutes Delay
-
South Carolina US 601
194mi From Pageland to Furman
3 hours 31 mins travel time instead of 3 hours 16 mins
15 minutes Delay
DOT Accident and Construction Reports
-
Road Closed
Beginning June 16, 2025, the Pinebrook School Road bridge over I-40 will be closed for repTYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road Closed
NCDOT contract forces will close SR 1003 (High Point Road) between SR 2643 (Union Cross RoTYPE: Construction Serious
-
Road Closed
NCDOT contract forces will close SR 1003 (High Point Road) between SR 2643 (Union Cross RoTYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, the intersection of Garden VieTYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, a portion of Oakridge Place DrTYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, a portion of Orvil Lane will bTYPE: Construction Moderate

601 North Carolina US 601 Traffic
Contractor will be closing a shoulder or lane of US-601, starting southbound, for utility