Miscellaneous Drainiage Shaft. Starts Mon, May 1st at 9am. 106 St NB, 34 Av - 35 Av will be reduced to a single lane. The 34 Av WB to 106 St NB Right turn bay will be closed. The North East corner will be closed to pedestrians with detours and temporary crosswalks installed.
106 St Nw - Edmonton, AB
Starts at May 01, 2023 06:00am Until: Apr 30, 2024 06:00am Severity: Minor
Tweet