Construction Drainage Shaft. Starts July 25th. 106st from 40ave to 42ave will be reduced to a single lane per direction due to a drainage shaft installation. Expect travel delays.
106 St Nw - Edmonton, AB
Starts at Jul 25, 2023 06:00am Until: Jul 31, 2024 06:00am Severity: Minor
Tweet