US 52: Construction work from Davis Rd (Indianapolis) to IN 9 (2m W of Morristown) (MM 95 to MM 82.1, ). Until 4/29/2024 at 3:00PM EDT. Guardrail replacement on both sides of the road. Watch for slowed or stopped traffic. Watch for flaggers. https://t.co/BFLd8tBQ7J
US 52 EB/WB: Construction work at I-465; Rockville Rd (MM 87.2, Indianapolis). Until 4/19/2024 at 5:00PM EDT. Left turn bay closed. https://t.co/bNnGNbcxqL