Current US 41 Tennessee Traffic Conditions
Length | 177mi |
Normal Travel Time | 2 hours 45 mins |
Current Travel Time | 3 hours 39 mins |
Expected Delay | 54 minutes |
Weather | Mist - 43° F - 15 mph wind |
DOT Accident and Construction Reports
-
Roadwork from N 1st St to Cowan St.
Road ClosedTYPE: Construction Serious
-
Roadwork from Cowan St to N 1st St.
Road ClosedTYPE: Construction Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Construction Serious
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious