Current NC-135 North Carolina Traffic Conditions
DOT Accident and Construction Reports
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, a portion of Old Winston Road TYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, a portion of Oak Grove Church TYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, a portion of Orvil Lane will bTYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, the intersection of Garden VieTYPE: Construction Moderate
-
Road Closed
As part of the Winston-Salem Northern Beltway construction, a portion of Oakridge Place DrTYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate

135 Mayodan Traffic
NCDOT Contractor forces are widening US158 from Old Greensboro Road to just east of Vance
61° F