Current US 50 Capon Bridge Maryland Traffic Conditions
DOT Accident and Construction Reports
-
TYPE: Construction Moderate
-
Severn Ave Road is closed from 6th St to 5th St.
Road ClosedTYPE: Miscellaneous Moderate
-
TYPE: Construction Serious
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
Closed road from exit [31] to Revell Hwy E.
Road ClosedTYPE: Miscellaneous Moderate
US 50 Capon Bridge MD News Reports
-
Maryland governor says 'long road ahead' after Baltimore bridge collapse
- Maryland
- Capon Bridge
- US 50
- source: Bing
- 3 views
- Mar 28, 2024 5:09pm
50Federal Highway Administration chief Shailen Bhatt said the emergency funding would '?help Maryland manage ... into the frigid, 50-foot-deep Patapsco River during the bridge collapse, only ... Read More
More results in our US 50 Capon Bridge Maryland Archives