Current Route 776 Traffic Conditions
Route 776 Traffic Delays
-
Alabama Route 776
250mi From to
4 hours 6 mins travel time instead of 3 hours 41 mins
25 minutes Delay
-
Mississippi Route 776
250mi From to
4 hours 6 mins travel time instead of 3 hours 41 mins
25 minutes Delay
DOT Accident and Construction Reports
-
Road Closed
State Route 56 both directions in Franklin County - At CROWNOVER RD., bridge replacement cTYPE: Construction Moderate
-
Road Closed
Construction: 2025-3-3 600 Block of Douglas St (Between Oak and McCallie UTC). Full ClosurTYPE: Construction Moderate

776 Alabama 776 Traffic