US 20 EB/WB: Long term road construction from I-94 to N 325 W (MM 45 to MM 47, 2m E of Michigan City). Until 12/23/2025 at 3:00PM CST. Roadway reduced to one lane, Work on the shoulder, Alternating lane closures. Speed limit 45 MPH. Width limit… https://t.co/1qt2AzvUul