-
1 week ago
US 40: Construction work from Franklin Rd to Post Rd (MM 84.4 to MM 64.8, Indianapolis). Until 4/19/2024 at 3:00PM EDT. Guardrail replacement on the North side of the road. Watch for lane merging and slowed traffic. https://t.co/S0z2BOwQGv
-
1 week ago
US 52: Construction work from Davis Rd (Indianapolis) to IN 9 (2m W of Morristown) (MM 95 to MM 82.1, ). Until 4/29/2024 at 3:00PM EDT. Guardrail replacement on both sides of the road. Watch for slowed or stopped traffic. Watch for flaggers. https://t.co/BFLd8tBQ7J
-
1 week ago
US 136: Truck restrictions in force at Green St (MM 67.4, Brownsburg). Until 1/1/2042 at 4:00PM EDT. US 136, at Green St (Brownsburg). Truck restrictions are in force. Until January 1, 2042 at about 4:00PM EDT. PERMANENT RESTRICTION FOR OVERSIZE LOADS… https://t.co/qKG4mTK4wU
-
1 week ago
IN 124 EB/WB: Road closed to traffic because of construction work from Wayne St to S 400 E (MM 2 to MM 2.6, 1m E of Peru). IN 124 in both directions, between Wayne St and S 400 E (1 mile east of the Peru area). The road is closed to traffic because of… https://t.co/OeHep1XPh3
-
1 week ago
US 150 EB: Construction work at Scenic Valley Dr (MM 169.3, near Galena). Left lane closed. https://t.co/q4Qyqo56gZ