Construction I-6064, Paving NB median and later setting median barrier wall from MM 13 to MM 17 in Lumberton. Motorists can expect narrowed lanes and possible barrier walls along the shoulder of I-95 between Exit 13 (I-74) and Exit 22 (US-301).
I-95 S / Us-301 S - Lumberton, NC
Starts at Nov 29, 2022 00:00am Until: Nov 01, 2026 11:00am Severity: Serious
Tweet