Construction Left lane closed. IH-10 TRAFFIC SWITCH ONTO CONSTRUCTED CRCP1) INSIDE LANE CLOSED FROM SMITH TO MAJOR TO TIE IN THE LEFT LANE TRANSITION2) SWAP TRAFFIC ONTO CONSTRUCTED CRCP LEFT LANE. AT THIS POINT THE OUTSIDE LANE WILL BE CLOSED FROM SMITH ROAD TO MAJOR FOR PLACEMENT OF SSCB FROM E/B DETOUR ONTO THE CONSTRUCTED CRCP; TO TIE IN RIGHT LANE TRANSITION
I-10 E - Beaumont, TX
Starts at Jan 16, 2024 04:02am Until: Feb 01, 2026 05:00am Severity: Serious
Tweet