Construction All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. Watch for flag personnel directing traffic. Motorists should expect delays. FOR THE CONSTRUCTION OF OVERLAY CONSISTING OF RESURFACE WITH THIN OVERLAY MIXTURE
Us-69 N Bus / Tx-287 Loop / N John Redditt Dr Sb - Lufkin, TX
Starts at Sep 26, 2023 00:42am Until: Jun 29, 2024 03:00am Severity: Moderate
Tweet