Construction One-way traffic control signal. All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. Travel lanes reduced to one lane. Contractor working in one mile sections. One lane traffic with temporary traffic signals being utilized. Expect delays.
S Fm 117 / Fm-117 - Crystal City, TX
Starts at May 24, 2022 11:35pm Until: Dec 01, 2024 05:00am Severity: Minor
Tweet