Construction One-way traffic control signal. All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. One way traffic control with delays. FM 2676 reduced to one lane with one-lane, two-way traffic control with temporary traffic signals for construction consisting of replacing the bridge at Hondo Creek. Lane width will be reduced to 12 ft. between barrier.
Fm 2676 / Fm-2676 - Hondo, TX
Starts at Jun 15, 2023 02:52am Until: Nov 30, 2024 06:00am Severity: Minor
Tweet