Construction All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. Alternating lanes closed. Delays due to slow moving road repair operations.
Us-83 N / US Highway 83 Nb - Shamrock, TX
Starts at Mar 06, 2024 10:04pm Until: Jun 01, 2024 03:00am Severity: Moderate
Tweet