Construction 420th St Road is closed from Highway 52 Blvd to County 7 Blvd due to roadwork.
420th St - Zumbrota, MN Road Closed
Starts at Sep 11, 2023 11:00am Until: Jan 01, 2029 05:59am Severity: Moderate
TweetZumbrota Minnesota Live Traffic and Accident Reports
Starts at Sep 11, 2023 11:00am Until: Jan 01, 2029 05:59am Severity: Moderate
TweetTYPE: Construction Moderate
TYPE: Construction Moderate
Traffic has been stuck at a standstill inside the garage for 30 minutes. No cars have moved in that time. We are stuck on the fourth level Read More
Another accident at 338 ave crossing Read More
At a standstill Read More
ZUMBROTA, Minn. - A public meeting was held on May 1 for the Minnesota Department of Transportation to present the potential concepts for the Highway 52 Hader to Zumbrota corridor. Read More
ZUMBROTA, Minn. - It's one of the few covered bridges remaining in the Midwest, and it's seen a lot of traffic over the years. "When you walk in here you feel the history. You feel things that ... Read More
ZUMBROTA, Minn. (KTTC) - The public meeting will review the Highway 52 Hader to Zumbrota corridor study on May 1. The meeting will be held in person at the Zumbrota VFW from 5:30 to 7:30 p.m., with a ... Read More
ZUMBROTA - A infant was injured in a vehicle crash on the interchange of U.S. Highway 52 and Minnesota Highway 60 on Friday evening, April 5, 2024. A 2017 Ford Transit Van was traveling north on ... Read More
More results in our 420th St Zumbrota Minnesota Archives