Construction Southbound milepost 19 over the Pioneer Memorial Bridge (Blue Bridge) between Pasco and Kennewick. Tuesday, May 28 through Saturday June 1 from 7 a.m. to 6 p.m. daily, there will be a single-lane closure with a speed reduction for bridge painting. Travelers are encouraged to use I-182 or US-397 as alternate routes.
2829 W Sylvester St - Pasco, WA
Starts at May 28, 2024 07:00am Until: May 29, 2024 01:00am Severity: Serious
Tweet