Miscellaneous Drainage Tunnel Shaft. Summit Dr will be reduced to one lane in each direction. The sidewalk on the North side will be closed form 142 St to approx 30m East.

Riverside Dr Nw - Edmonton, AB Road Closed

Time of Incident Starts at May 15, 2023 06:00am Until: May 31, 2024 06:00am Severity: Moderate

Closest Traffic Camera feed

Transportation and utility corridor: Hwy  & Hwy A Interchange (East) Traffic Camera
Transportation and utility corridor: Hwy & Hwy A Interchange (East) Traffic Cam




DOT Accident and Construction Reports

User Reports



Riverside Dr Nw Edmonton Alberta Archives More results in our Riverside Dr Nw Edmonton Alberta Archives