Construction Highway 6 EW. Construction work between Mountain View Ave and Shuswap Ave for 1.0 km (Lumby). Until Thu May 30. Possible delays. Watch for traffic control. Last updated Wed Mar 27 at 2:41 PM PDT. (DBC-61412)
Vernon St Wb - Lumby, BC
Starts at Mar 14, 2024 07:00am Until: May 31, 2024 06:59am Severity: Moderate
Tweet