On the SR 168 Bike and Pedestrian Improvements Project in Bishop, crews are pouring concrete to create approximately 750 feet of new sidewalk, curb, and gutter on the south side of the road between Pioneer Lane and Sunland Drive. There will be 2 fresh driveways and 3 curb ramps. https://t.co/vzQOdqevUV