I-69 NB: Alternating lane closures because the road is being repaved from IN 5 (7m N of Landess) to US 224 (near Markle) (MM 276 to MM 286, ). Until 10/11/2025 at 1:00PM EDT. Night time construction work, Width limit in effect. Speed limit 55 MPH. Width… https://t.co/3wPWV6PJi3
I-69 NB/SB: Work on the shoulder from IN 5 to IN 5 (MM 272.2 to MM 273, 3 to 4m N of Landess). Until 10/22/2025 at 8:00PM EDT. Right shoulder closed, Intermittent lane closure, Open. EventIcon I-69 in both directions, between IN 5 and IN 5 (3 to 4 miles… https://t.co/BwaVEy1pPJ