-
4 days ago
Hwy519 east of Granum - MVC. Expect one lane alt-traffic and delays in the area. (1:04pm) #ABRoads
-
4 days ago
Update: NB Stoney Tr approaching 16 Ave NE, in Calgary - MVC is now clear. (9:10am) #ABRoads #yyctraffic https://t.co/V5WVNH3pnB
-
4 days ago
NB Stoney Tr approaching 16 Ave NE, in Calgary - MVC blocking the left lane. Expect delays. (8:05am) #ABRoads #yyctraffic
-
4 days ago
Hwy58, approx. 50 km west of Hwy35, unloading of equipment July26 from 730am to 430pm. Single lane alt traffic with speed reduced. Drive with caution and watch for crews. (6:32am) #ABRoads
-
4 days ago
Special Event: Cardston area, Jul.26, 7:30am to 4pm. Hwys 2, 5, 501, 505 & 800 will be affected. Watch for cyclists in the area. #ABRoads
-
4 days ago
EB Hwy16 btwn Sherwood Dr and Clover Bar Rd in Sherwood Park, paving operations in progress until 4am, July27. RH lane closed and speed reduced to 50 km/h. Drive with caution and expect delays. (12:37am) #ABRoads #yegtraffic
-
4 days ago
Anthony Henday Dr (SW leg) to east and west Whitemud Dr, Edmonton - ramps closed for construction work, Jul.25 9:30pm to Jul.26 2am. #ABRoads #yegtraffic
-
4 days ago
Closed due to accident in #Portland on I 5 SB between Rosa Park Way/Exit 304 and N Alberta St Exit, stopped traffic back to N Denver Ave. Reported by Tripcheck #PDXtraffic https://t.co/cq6BNJ5B3O
-
4 days ago
NB & SB Stoney Tr NW at 16 Ave, Calgary - street sweeping, Jul.25 9:15pm to Jul.26 12:15am. Drive with caution in the area. #ABRoads #yyctraffic
-
4 days ago
Hwy16 at Hwy824, Ardrossan - bridge washing, Jul.25 8:30pm to Jul.26 5am. Expect alt lane closures in both directions, speed reduction to 50km/h with temporary traffic lights. #ABRoads
-
4 days ago
NB Anthony Henday Dr before Sherwood Park Fwy, Edmonton - construction work, Jul.25 8pm to Jul.26 12am. Expect single lane traffic with alternating lane closures. #ABRoads #yegtraffic
-
5 days ago
NB & SB Stoney Tr from 16 Ave NE to 17 Ave SE, Calgary - crack sealing, Jul.25-27 nightly from 10pm to 6am. Expect lane closures with speed reduced to 50km/h. #ABRoads #yyctraffic
-
5 days ago
Update: SB Deerfoot Tr at 16 Ave NE, in Calgary - MVC is now clear. (11:14am) #ABRoads #yyctraffic https://t.co/XKgNmSuNNd
-
5 days ago
SB Deerfoot Tr at 16 Ave NE, in Calgary - MVC blocking the right hand lane. Expect delays. (9:58am) #ABRoads #yyctraffic
-
5 days ago
Hwy63 over the Athabasca River, south of Ft McKay, bridge inspection July25 from 10am to 3pm. Single lane alt traffic with speed reduced. Drive with caution and expect delays. #ABRoads
-
5 days ago
NB Deerfoot Tr ramp to Memorial Dr SE, Calgary - bridge inspection July25 from 930am to 330 pm. Speed reduced to 50 km/h. Drive with caution and watch for crews. #ABRoads #yyctraffic
-
5 days ago
Update: EB Stoney Tr and Spruce Meadows Way SW, in Calgary - Traffic incident has been cleared. (5:02am) via @yyctransport #ABRoads #yyctraffic https://t.co/EjHtHZBjqj
-
5 days ago
EB Stoney Tr and Spruce Meadows Way SW, in Calgary - Traffic incident, blocking the LH lane. (2:37am) via @yyctransport #ABRoads #yyctraffic
-
5 days ago
EB Baseline Rd (101Ave NW) ramp to SB Anthony Henday Dr - CLOSED - for paving work in progress until 3am July25. Local road detour in place. (9:45pm) #ABRoads #yegtraffic
-
5 days ago
Hwy11 btwn RR25 and Hwy766, NW of Benalto, road maintenance work in progress until 3am July25. Single lane alt traffic. Expect delays and watch for crews. (9:38pm) #ABRoads