>>
US Route 258 >>
Weather Conditions
Current US 258 Weather Conditions
More results in our US 258 Archives
DOT Accident and Construction Reports
-
Crossline pipe replacement.
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
The road Road is closed near Jonestown Road.
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Serious
-
Pipe Replacement
Road ClosedTYPE: Construction Serious
-
Crossline pipe replacement
Road ClosedTYPE: Construction Serious
-
The bridge which crosses over US 117 will be closed. Motorists are advised to follow poste
Road ClosedTYPE: Construction Serious
-
Demolition and installation of Bridge 29 over Fork Swamp and improving drainage in the are
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Serious