Current US 79 Tennessee Traffic Conditions
Length | 175mi |
Normal Travel Time | 2 hours 55 mins |
Current Travel Time | 3 hours 14 mins |
Expected Delay | 19 minutes |
Weather | Mist - 57° F - 9 mph wind |
DOT Accident and Construction Reports
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
KY 1485/Bellview Rd is blocked at the Terrapin Creek Bridge. The bridge Road is closed to
Road ClosedTYPE: Miscellaneous Serious
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Congestion Serious
-
TYPE: Construction Serious
-
TYPE: Construction Serious