Current US 209 Pennsylvania Traffic Conditions
Length | 133mi |
Normal Travel Time | 2 hours 24 mins |
Current Travel Time | 2 hours 34 mins |
Expected Delay | 10 minutes |
Weather | Clear - 26° F - 4 mph wind |
US 209 Pennsylvania Live Traffic Cams
DOT Accident and Construction Reports
-
TYPE: Accident Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious
-
Downed tree in wires on CHERRY VALLEY RD both directions between LESSIG LN and BANGOR MOUN
Road ClosedTYPE: Miscellaneous Serious
-
Closed road from US Highway 46 to I-80 E.
Road ClosedTYPE: Miscellaneous Serious
-
TYPE: Miscellaneous Serious
-
Construction on US 46 eastbound ramp to southbound NJ 94 (Knowlton Twp), Continuous Friday
Road ClosedTYPE: Construction Serious
-
NJ DOT - STMC: construction on US 46 eastbound ramp to southbound NJ 94 (Knowlton Twp), Co
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Serious
-
Walnut St Road is closed from CR-521/Hope Blairstown Rd (Millbrook Rd/CR-611) to CR-519/Ho
Road ClosedTYPE: Miscellaneous Serious