Current US 40 Ohio Traffic Conditions
| Length | 226mi |
| Normal Travel Time | 3 hours 20 mins |
| Current Travel Time | 3 hours 38 mins |
| Expected Delay | 18 minutes |
| Weather |
US 40 Ohio Live Traffic Cams
DOT Accident and Construction Reports
-
Road Closed
The SR 315 southbound ramp to I-70 eastbound The SR 315 southbound ramp to I-70 eastbound TYPE: Miscellaneous
-
Road Closed
IR-70 eastbound. The I-70 eastbound ramp to Front St. will close permanently starting JuneTYPE: Construction Serious
-
Road Closed
US-40 southbound. The ramp from Broad St. to I-71 southbound Road is closed permanently.TYPE: Miscellaneous Serious
-
Road Closed
S.R. 72 over I-71. eastbound. Rehab bridges by repairing the backwall; replacing deck and TYPE: Construction Moderate
-
Road Closed
Blaine Hill Bridge Rehabilitation Project in both directions. A project to rehabilitate thTYPE: Construction Serious

40 Columbus Traffic
44° F