Current US 60 North Carolina Traffic Conditions
| Length | 135mi | 
| Normal Travel Time | 2 hours 5 mins | 
| Current Travel Time | 2 hours 36 mins | 
| Expected Delay | 31 minutes | 
| Weather | 
DOT Accident and Construction Reports
- 
	
	
TYPE: Construction Serious
 - 
	
	
TYPE: Construction Serious
 - 
	
Road Closed
Bridge 960221 closed on Billings Hill Church RdTYPE: Construction Moderate
 - 
	
Road Closed
Beginning June 16, 2025, the Pinebrook School Road bridge over I-40 will be closed for repTYPE: Construction Moderate
 - 
	
Road Closed
Road closed to all activity for repaving and infrastructure repair. Detour in place via NCTYPE: Construction Moderate
 - 
	
	
TYPE: Construction Serious
 - 
	
Road Closed
The Blue Ridge Parkway Road is closed in North Carolina due to damage from Hurricane HelenTYPE: Construction Moderate
 
US 60 NC News Reports
- 
										
Nor'easter slamming mid-Atlantic, Northeast leading to coastal flooding, tropical-storm-force wind gusts
- North Carolina
 - US 60
 
- source: Bing
 - 15 views
 - Oct 12, 2025 02:47am
 
 60
																						 
											A truck overtaken by waves on Highway 12 on Hatteras Island in North Carolina ... High Wind Warnings are in effect for wind gusts of up to 60 mph from the Outer Banks of North Carolina northward to ... Read More
 
  More results in our US 60  North Carolina Archives
				
60 Mocksville Traffic
Contractor will be closing lane(s) of US-601 starting southbound, establishing new traffic
49° F