Current Route 488 New York Traffic Conditions
DOT Accident and Construction Reports
-
Road Closed
Longterm construction on NY 96 Bushnell Basin ramp to I-490 WB (Perinton), Continuous MondTYPE: Construction Serious
-
TYPE: Construction Serious
-
Road Closed
NYSDOT - Region 4: bridge rehabilitation and longterm construction on NY 31 ramp to I-490 TYPE: Construction Serious
-
Road Closed
NYSDOT - Region 4: bridge rehabilitation and longterm construction on South Ave southboundTYPE: Construction Serious
-
TYPE: Planned Event Moderate

488 Clifton Springs Traffic
Bridge replacement on I-490 eastbound between Exit 26 - NY 31 (Perinton) and Exit 28 - I-4
36° F