Current 93-ave Alberta Traffic Conditions

DOT Accident and Construction Reports
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
Road ClosedPower Install. Eastbound directional closure of 100 Ave from 112 St to 113 Street, from Ma
TYPE: Miscellaneous Moderate
-
Road ClosedDrainage Tunnel Shaft. Summit Dr will be reduced to one lane in each direction. The sidewa
TYPE: Miscellaneous Moderate
-
TYPE: Construction Serious
-
Road ClosedWest LRT Construction. Total closure of 118 St on the south side of 104 Ave. For more info
TYPE: Construction Moderate
-
TYPE: Construction Minor
-
TYPE: Construction Minor
-
TYPE: Miscellaneous Minor