Current Route 302 Vermont Traffic Conditions
DOT Accident and Construction Reports
-
TYPE: Construction Serious
-
I-91 SB from Exit 16 to Exit 15 (Bradford to Fairlee), FULL CLOSURE of the southbound lane
Road ClosedTYPE: Construction Serious
-
Closed road from VT-25 exit [16] to I-91 S.
Road ClosedTYPE: Miscellaneous Serious
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Congestion Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Construction Minor
-
NH-112 / Main St Road is closed from I-93/Senator Styles Bridges Hwy (Main St/NH-112) to B
Road ClosedTYPE: Miscellaneous Minor