WB I-580 Richmond–San Rafael Bridge | Camera, electrical & concrete work will require lane and bike path closures:• Thu 1/22: 12 AM–4 AM — Lane 1 CLOSED
• Fri 1/23: 9 PM–6 AM — Lane 2 & Bike Path CLOSED
• Sat 1/24: 8 PM–5 AM — Lane 2 & Bike Path CLOSED (shuttles provided) https://t.co/Y0TBZApzsC