Berkshire County Live Road Conditions
More results in our Massachusetts Archives
Live Reports from the DOT's Twitter
-
1 day ago
WBZTraffic#MATraffic update - the crash on I-93 SB in #Medford has cleared. All lanes open. Residual traffic is jammed back to Rte 60.
-
1 day ago
WBZTraffic#MATraffic - #Medford - I-93 SB at Exit 21 (Rte 38/Mystic Ave). A crash blocking the left center lane with traffic jammed approaching the scene.
-
1 day ago
WBZTraffic#MATraffic update - the crash on Rte 24 SB in #Brockton has cleared. All lanes open. Heavy residual delays in the area.
-
1 day ago
WBZTraffic#MATraffic - #Brockton - Rte 24 SB after Exit 33 (Rte 27). A crash blocking the two left travel lanes with traffic jammed approaching the scene.
-
1 day ago
WBZTrafficRT @BostonLogan: There will be lane and sidewalk closures on the Terminal B Arrivals and Departures Level and a temporary relocation of the…
-
2 days ago
MassDOTTonight 11/13, at 6:00PM, #MassDOT will hold an in-person public information meeting to discuss the #Haverhill- #Methuen I-495 and Industrial Ave Bridge Replacements project. Location: Haverhill City Hall, Room 301, 4 Summer Street, Haverhill ℹ️https://t.co/mY3KCGp9gK https://t.co/dFrsy0Xdpx
-
2 days ago
MassDOTOn 11/20, at 6:30PM, #MassDOT will hold a virtual public information meeting to present the design for the proposed intersection improvements at Route 138 and Bradlee Road project in #Milton. ℹ️https://t.co/GWKUteNKbq https://t.co/s1LsymPQV6
-
2 days ago
MassDOTTonight 11/13, at 6:00PM, #MassDOT will hold a hybrid (in-person/ online) I-90 Allston Multimodal Project Task Force Meeting. Location: Josephine A. Fiorentino Community Center, 123 Antwerp Street, Brighton, ℹ️https://t.co/nvyotWghhr https://t.co/YDTYfkOjni
-
2 days ago
MassDOTTonight 11/13, at 6:30PM, #MassDOT will hold a virtual design public hearing to present the design for the proposed Route 28 reconstruction project in #Dennis. ℹ️https://t.co/DLFqiuuF4V https://t.co/oL1c4Qk1xI
-
2 days ago
WBZTrafficRT @CityofWaltham: ⚠️ HEADS UP! The Water & Sewer Department will be working at 1086 Main Street this Saturday, November 15th and the stree…
-
2 days ago
MassDOTCorrection. The deadline for entries is December 5, 2025. https://t.co/YZKxLYaJZ5
-
2 days ago
WBZTraffic#MATraffic update - the crash on I-95/Rte 128 SB in #Woburn has cleared. All lanes open. Residual traffic is jammed back to Rte 28 in #Reading.
-
2 days ago
WBZTraffic#MATraffic - #Woburn - I-95/Rte 128 SB at Exit 53 (Rte 38). A crash blocking the two left travel lanes with traffic jammed approaching the scene.
-
2 days ago
WBZTraffic#MATraffic update - the crash on I-95/Rte 128 SB in #Burlington has cleared. All lanes open. Residual traffic is jammed back to I-93 in #Woburn.
-
2 days ago
WBZTrafficRT @KristenEckRadio: Multi-vehicle pile-up on Rte 128/I-95 SB before Rte 3 in Burlington. Stay left. #BostonTraffic #MATraffic
DOT Accident and Construction Reports
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
Road Closed
Roadwork from Logan Memorial Way to Boston.TYPE: Construction Serious
-
TYPE: Construction Moderate
