ERROR 404 The document you're trying to reach no longer exists.

User Reports

Closest Traffic Camera feed

I-275 at Hamilton Ave / US-127 Traffic Camera
I-275 at Hamilton Ave / US-127 Traffic Cam
I-275 at Mosteller Rd Traffic Camera
I-275 at Mosteller Rd Traffic Cam
I-75 at N of Union Centre Blvd Traffic Camera
I-75 at N of Union Centre Blvd Traffic Cam

Closest Traffic Camera feed

I-275 at Hamilton Ave / US-127 Traffic Camera
I-275 at Hamilton Ave / US-127 Traffic Cam
I-275 at Mosteller Rd Traffic Camera
I-275 at Mosteller Rd Traffic Cam
I-75 at N of Union Centre Blvd Traffic Camera
I-75 at N of Union Centre Blvd Traffic Cam




Live Reports from the DOT's Twitter

  • Posted 8 minutes ago
    CaltransDist6CaltransDist6

    The rehabilitation of State Route 41 from Nevada Avenue to State Route 198 will include cold plaining, hot mix asphalt paving, and concrete slab replacements. The project will preserve and resurface the existing lanes of State Route 41 between Nevada Avenue and State Route 198.

  • Posted 9 minutes ago
    CaltransDist6CaltransDist6

    KINGS COUNTY − The Department of Transportation, (Caltrans), in cooperation with GRANITE CONSTRUCTION COMPANY, announces the commencement of the State Route 41 Nevada Avenue to State Route 198 Pavement Rehabilitation Project. https://t.co/0QvTFjugvT

  • Posted 16 minutes ago
    AlgoTrafficAlgoTraffic

    RT @algo_mgm: Planned Roadway Improvements cleared on US231/Troy Hwy @ MP 104.83 before US82 in Montgomery County. More details:

  • Posted 16 minutes ago
    AlgoTrafficAlgoTraffic

    RT @algo_mgm: Planned Roadway Improvements cleared on AL147 @ MP 5.83 at AL14 in Auburn until AL147 at US280 in Auburn. More details:

  • Posted 17 minutes ago
    AlgoTrafficAlgoTraffic

    RT @algo_tus: Minor Crash cleared on US82/McFarland Blvd WB @ MP 51.38 at 15th St/Veterans Memorial Pkwy in Tuscaloosa. More details:

  • Posted 17 minutes ago
    AlgoTrafficAlgoTraffic

    Planned Roadway Improvements cleared on I-65 SB @ MP 219.64 at Exit 219: CR42 in Jemison. More details: https://t.co/GCTIXbqwcG

  • Posted 17 minutes ago
    AlgoTrafficAlgoTraffic

    RT @AlgoTraffic: Planned Roadway Improvements cleared on I-65 SB @ MP 219.64 at Exit 219: CR42 in Jemison. More details: https://t.co/GCTIX…

  • Posted 17 minutes ago
    AlgoTrafficAlgoTraffic

    RT @algo_mgm: Planned Roadway Improvements cleared on US82 @ MP 141.03 at Washington Ferry Rd in Prattville until US82 @ MP 142.92 at S Mem…

  • Posted 17 minutes ago
    AlgoTrafficAlgoTraffic

    RT @AlgoTraffic: Other cleared on I-65 NB @ MP 253.7 at Exit 254: Alford Ave in Birmingham. More details: https://t.co/ftKiW4DPYV

  • Posted 17 minutes ago
    AlgoTrafficAlgoTraffic

    Other cleared on I-65 NB @ MP 253.7 at Exit 254: Alford Ave in Birmingham. More details: https://t.co/ftKiW4DPYV

DOT Accident and Construction Reports

User Reports



   Archives More results in our Archives