Construction All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. Motorists should expect delays. One-way traffic control signal. Travelers should expect a 5-minute delay. Work zone speed reduced to 45 mph near portable traffic signal.
TX-153 / STATE HIGHWAY 153 - Sweetwater, TX
Starts at Apr 25, 2024 6:00pm Until: Jun 08, 2024 04:00am Severity: Minor
Tweet