ERROR 404 The document you're trying to reach no longer exists.

User Reports

Closest Traffic Camera feed

I-275 at Hamilton Ave / US-127 Traffic Camera
I-275 at Hamilton Ave / US-127 Traffic Cam
I-275 at Mosteller Rd Traffic Camera
I-275 at Mosteller Rd Traffic Cam
I-75 at N of Union Centre Blvd Traffic Camera
I-75 at N of Union Centre Blvd Traffic Cam

Closest Traffic Camera feed

I-275 at Hamilton Ave / US-127 Traffic Camera
I-275 at Hamilton Ave / US-127 Traffic Cam
I-275 at Mosteller Rd Traffic Camera
I-275 at Mosteller Rd Traffic Cam
I-75 at N of Union Centre Blvd Traffic Camera
I-75 at N of Union Centre Blvd Traffic Cam




Live Reports from the DOT's Twitter

  • Posted 2 minutes ago
    ArizonaDOTArizonaDOT

    Eastbound L-202 (Red Mountain Freeway) has reopened at Gilbert Road. There is a very heavy delay in the area; please be patient while that clears. https://t.co/Mr6xdW858S

  • Posted 3 minutes ago
    ArizonaDOTArizonaDOT

    UPDATE: The freeway has reopened.

  • Posted 10 minutes ago
    ArizonaDOTArizonaDOT

    🚧 I-10 Tunnel Closure - Phoenix 🚧 The weekend of May 17-19, I-10 drivers in central Phoenix should use alternate routes and allow extra travel time while sections of the freeway are closed for scheduled tunnel maintenance. More: https://t.co/ytKHqEEzCQ https://t.co/XZ0e4FzWxp

  • Posted 35 minutes ago
    ArizonaDOTArizonaDOT

    Eastbound L-202 remains closed at Gilbert Road; the delay is back to Mesa Drive. There is no estimated time to reopen the eastbound lanes. https://t.co/VrYbeBGLhw

  • Posted 1 hour ago
    511PAStatewide511PAStatewide

    CLEARED: Crash on US 22 eastbound between PA 225/Allegheny St and PA 225/Allegheny St.

  • Posted 1 hour ago
    511WI511WI

    Cleared | MILWAUKEE Co | Crash | WIS 100 NB/SB | I-43 NB | Other | https://t.co/tYLOLcVAKG

  • Posted 1 hour ago
    WSBTrafficWSBTraffic

    🚧South Fulton: I-285/sb (Outer Loop) at Washington Rd. (Exit 1). Construction; two right lanes blocked. #ATLtraffic🚧 https://t.co/xIt6IDQpay

  • Posted 1 hour ago
    DriveBCDriveBC

    🚧🦺#BCHwy7 Westbound paving operations between 250th St and 240th St in #MapleRidge until 5 am. Right lane is closed. Watch for traffic control personnel. https://t.co/vObepyHW2a

  • Posted 1 hour ago
    StLouisTrafficStLouisTraffic

    1 VEHICLE CRASH ON I-270 S PAST I-44. LEFT TWO LANES CLOSED.

  • Posted 1 hour ago
    MDOT_MetroDetMDOT_MetroDet

    Moving Work Crew: WB I-96 Local from Davison to Telegraph the right shoulder is closed due to a moving sweeping crew until 5am

DOT Accident and Construction Reports

User Reports



   Archives More results in our Archives