One lane will remain open in each direction, and traffic should return to normal lanes by August, with project completion expected in September. The eastbound bridge will be completed in 2027. Access to the Cumberland Road Rest Area will not be affected. https://t.co/QPZyR9s00j
⚠️TRAVEL ADVISORY⚠️
Cumberland: Overturned vehicle blocking two left lanes on the ramp from I-75/sb to I-285/eb (inner loop). Delays. #ATLtraffichttps://t.co/nam9RJSC2l