Best Project, Highway / Bridge: SR 679 (Pinellas Bayway) Structure E Design-Build

When the American Bridge team was awarded the $56.8-million design-build contract to build its replacement, the original Pinellas Bayway bridge had reached the end of its useful life and had no ... > react

Open the Full Article Open the Full Article - Posted 3 years ago

React to this Article

Your Name or Nickname

Your Email (will not be shown)
1 x 1 = ?

The source opens up when you press the "Open The Full Article" link above. Its content doesn't belong to us, we're not responsible for it. If you don't think this content is appropriate, or if you're the owner of the source and do not wish to have your article displayed here, please just contact us.

Latest Pinellas Bayway News Reports



Pinellas Bayway   Archives More results in our Pinellas Bayway Archives