How's the traffic right now?
US 131 Heartside-downtown Michigan Accident Reports
DOT Accident and Construction Reports
-
TYPE: Miscellaneous
-
TYPE: Construction Serious
-
TYPE: Construction Serious
-
TYPE: Accident Serious
-
TYPE: Construction Moderate
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
Road ClosedI-196 E Bus Spur / Cesar E. Chavez Ave SW Road is closed from Clyde Park Ave SW (Grandvill TYPE: Construction Serious
-
Road ClosedI-196 W Bus Spur / Cesar E. Chavez Ave SW Road is closed from Hall St (Grandville Ave) to TYPE: Miscellaneous Serious
-
TYPE: Construction Moderate
-
TYPE: Construction Serious
-
Road ClosedKalamazoo Ave SE Road is closed from Franklin St (Kalamazoo Ave) to Hall St (Kalamazoo Ave TYPE: Miscellaneous Serious
-
TYPE: Construction Moderate
-
Road ClosedClosed road from exit [82B] to Hynes Ave SW. TYPE: Miscellaneous Moderate
-
TYPE: Construction Moderate
-
TYPE: Miscellaneous Moderate
-
Road ClosedNB US-131 ramp to I-96 closed for construction TYPE: Construction Serious
-
TYPE: Miscellaneous Serious
-
TYPE: Construction Serious
-
Road ClosedClosed road from I-96 exit [89] to I-96 E. TYPE: Miscellaneous Serious