-
6 days ago
UPDATE: All clear for scheduled roadwork on 15th Ave NW between NW 54th St & NW 58th St
-
6 days ago
Cleared 1:33 AM : On I-405 northbound at SE 8th St (MP 13) there is a collision blocking the 2 left lanes.
-
6 days ago
Scheduled roadwork on 15th Ave NW between NW 54th St & NW 58th St, reducing NB & SB traffic to one lane each direction. Use caution. https://t.co/oFlStM7kcc
-
6 days ago
UPDATE: On southbound SR 99 at 148th St SW (MP 50), the collision is now blocking only the right lane.
Emergency responders are on the scene.
Drive with caution and expect delays. https://t.co/RaggzTi1RX https://t.co/DvcZlHDPGo
-
6 days ago
On SR 99 southbound at 148th St SW (MP 50) there is a collision blocking the 2 right lanes.
-
1 week ago
On I-405 southbound at SE 8th St (MP 13) there is a collision blocking the left lane.
-
1 week ago
Cleared 3:24 PM : On I-5 southbound at S 188th St (MP 152) there is a disabled vehicle blocking the left center lane.
-
1 week ago
HEADS UP FEDERAL WAY! From 9 p.m. Monday, June 23 to 5 a.m. Tuesday, June 24, the right lane of NB I-5 will close between South 288th Street (milepost 146) and South 272nd Street (milepost 147) for paving. The off-ramp from I-5 to South 272nd Street will also close. Plan ahead! https://t.co/oyrEN2uv6t
-
1 week ago
Accident With Injury in #EastBatonRouge on Mohican St at N 38th St #traffic https://t.co/1WyWN3ulTM
-
1 week ago
Paving operations - Center Turn Lane in #Pima on 6th Ave between E Irvington Rd and S Stone Ave/18th St. Reported by TDOT #traffic https://t.co/bc4TAizExm
-
1 week ago
🚚#BCHwy1 - industrial traffic may slow you down between 248th St and Bradner Rd on weeknights until the end of July.
Watch for traffic control.
#Abbotsford #LangleyBC
ℹ️https://t.co/E2pL9xMiaC https://t.co/VipZVFTNBd